Things To Know Before Getting An FM 200 Refill

Refilling an FM 200 fire suppression system is a critical maintenance task that ensures the system remains operational and ready to protect against fire hazards. Before initiating the FM200 refill process, there are several key considerations and steps to be aware of:

System inspection:

Before proceeding with the refill, conduct a thorough inspection of the FM 200 suppression system to assess its condition. Check for any signs of damage, leaks, or malfunctioning components that may affect the effectiveness of the system.

Compliance with regulations:

Ensure that the refill process complies with all relevant regulations, standards, and codes governing fire suppression systems. This includes adherence to manufacturer recommendations, local fire codes, and environmental regulations regarding the handling and disposal of FM 200 agent.

Qualified service provider:

Engage the services of a qualified and experienced technician or service provider to perform the FM 200 refill. Verify that the provider is certified and trained in handling FM 200 systems and has the necessary equipment and expertise to complete the refill safely and effectively.

Determine refill quantity:

Determine the correct quantity of FM 200 agent required for the refill based on the system’s design specifications and manufacturer recommendations. Consult with the service provider or refer to the system documentation to ensure accurate refilling.

Shutdown and depressurization:

Before refilling the system, shut down and depressurize the FM 200 storage containers and piping network to safely access and service the components. Follow proper procedures for isolating the system from the protected area and relieving pressure from the containers.

Agent transfer:

Transfer the FM 200 agent from the refill cylinders to the storage containers in the suppression system. Use appropriate transfer equipment and techniques to prevent contamination or loss of agent during the refill process.

Also, inspect the system for any leaks or integrity issues during the refill process. Utilize leak detection methods such as pressure testing or visual inspection to identify and address leaks promptly. Repair or replace damaged components as needed to ensure system integrity.

Once the refill is complete, recharge the FM 200 suppression system to the specified pressure levels and verify proper operation. Conduct functional tests to ensure that all components, including detection devices, control panels, and discharge mechanisms, are functioning correctly.